OrderCancelReplaceRequest (35=G)
termKept in this browser · My desk
The FIX message that changes an open order (price, quantity, instructions) under a new ClOrdID that points back to the previous one in OrigClOrdID.
An immediate answer is required: a Pending Replace report and then Replaced, or an OrderCancelReject (35=9). Quantities are totals for the whole order across all its versions, so OrderQty = CumQty + LeavesQty still holds after the replace. Senders chain identifiers optimistically, to the last request not rejected; receivers pessimistically, to the last one accepted.
Standard and venues. FIX Latest asks the sender to resend every application field with its original value except those that change; B3 says only the changed fields need to be sent. When a decrease falls below what has already traded, FIX Latest amends the quantity to the filled amount and reports Replaced and Filled, while B3 cancels the order. B3 publishes which changes cost time priority (price, stop price, a larger quantity, minimum quantity) and which keep it (a smaller quantity, order type, validity, account). Nasdaq's OUCH gives every replaced order a new time-priority timestamp and offers a separate Modify message for changes that keep priority.
Also known as: cancel/replace, cancel replace, order modification request, 35=g, origclordid, modificação de ordem
Sources
- FIX Latest, Trade, as of EP284, November 2023, sections 3.1.5 to 3.1.7 (read 2026-11-16): immediate response required; Pending Replace recommended; optimistic chaining by the sender, pessimistic by the receiver; all application fields resent; CxlRejReason 2 for fields a firm will not change
- FIXimate (Orchimate), OrigClOrdID (41) (read 2026-11-16): ClOrdID of the previous order, not the initial order of the day
- FIX Latest, Order State Changes, as of EP284, scenarios C.1.b and C.3.c (read 2026-11-16): replace of a partly filled order reported as Replaced and Partially Filled; a decrease below the filled quantity amended to it, Replaced and Filled
- B3, EntryPoint messaging guidelines 2.9.31, 16 December 2025, sections 6.3, 6.5 and 6.6 (read 2026-11-16): OrderQty is the total investor quantity; only changed fields need be sent; a decrease below CumQty cancels the order; priority lost on price, stop price, larger quantity, minimum quantity
- Nasdaq, OUCH 5.0, updated October 2025, sections 2.2 and 2.4 (read 2026-11-16): a replace always gives a new time-priority timestamp; Modify keeps priority; quantity is the total for the chain